The heart of the Cyclone, the high-speed drying chamber, was isolated and constructed as a continuous drying chamber: Booster. It can be easily integrated into existing processes at investment casting companies. Drying times are drastically reduced and the shell building process is boosted. In the Booster one shell after another can be dried and it is particularly suitable for the fast production of single casting shells within a day.